TMN TAN YU LAI - RUBBLE WALL FAILURE - IKRAM 2

Taman Tan Yew Lai Rubble Wall Failure

  • Home
  • Case
  • Taman Tan Yew Lai Rubble Wall Failure

Projects highlight

  • Slope Emergency repair work for rubble wall failure at Taman Tan Yew Lai.
  • Work with authorities & IKRAM to design and implement emergency stabilization works by utilizing soil nail and shotcrete to cease slope movement.
  • To design long-term permanent stabilization by designing and implementing geotechnical structures such as retaining wall, micropile and geogrid slope to reinstate the failed rubber wall.